These are the steps in one sentence:

Find a windy site.
Make sure the site has nearby transmission lines.
Define the boundaries.
Determine who owns the land within the prospect boundaries.
Contact the landowners.
Call a town meeting.
Settle the contracts.
Draw up blueprints.
Watch the wind.
Get the necessary permits.
Perform environmental analyses.
Test the wires.
Sell the electricity.
Begin construction.

For further details have a look at:http://www.horizonwind.com/projects/developingawindfarm.aspx

Related Posts:
  1. Permit Granted For Statkraft’s First Wind Farm in Sweden

    The Environmental Testing Delegation has announced that Statkraft and SCA have been granted permit for the first of six wind...

  2. First Wind Turbines Arrived At Kelburn Wind Farm

    The first wind turbine components arrived on the 5th of September (2011) at RES’s Kelburn Wind Farm, in North Ayrshire....

  3. TOPFARM – Next Generation Wind Farm Design Tool To Optimize Wind Farm Topology and Operation

    In the future a substantial part of new wind turbine installations are foreseen to be erected in big onshore or...

  4. Siemens Energy will Supply 175 Wind Turbines for the World’s Largest Offshore Wind Farm – London Array

      Siemens Energy will supply 175 SWT-3.6 turbines to the London Array offshore wind project, which is owned by DONG...

Leave a Reply