These are the steps in one sentence:
Find a windy site.
Make sure the site has nearby transmission lines.
Define the boundaries.
Determine who owns the land within the prospect boundaries.
Contact the landowners.
Call a town meeting.
Settle the contracts.
Draw up blueprints.
Watch the wind.
Get the necessary permits.
Perform environmental analyses.
Test the wires.
Sell the electricity.
Begin construction.
For further details have a look at:http://www.horizonwind.com/projects/developingawindfarm.aspx
Related Posts:- Permit Granted For Statkraft’s First Wind Farm in Sweden
The Environmental Testing Delegation has announced that Statkraft and SCA have been granted permit for the first of six wind...
- First Wind Turbines Arrived At Kelburn Wind Farm
The first wind turbine components arrived on the 5th of September (2011) at RES’s Kelburn Wind Farm, in North Ayrshire....
- TOPFARM – Next Generation Wind Farm Design Tool To Optimize Wind Farm Topology and Operation
In the future a substantial part of new wind turbine installations are foreseen to be erected in big onshore or...
- Siemens Energy will Supply 175 Wind Turbines for the World’s Largest Offshore Wind Farm – London Array
Siemens Energy will supply 175 SWT-3.6 turbines to the London Array offshore wind project, which is owned by DONG...