Feed-in Tariffs For Renewable Energy in France


  Hydro Wind
Price New installations
purchase contracts subject to decree of 1/03/2007:
60,7 €/MWh
+ bonus between 5 and 25 €/MWh for small
installations
+ bonus between 0 and 16,8 €/MWh in winter
depending on the regularity of production
(for 20 years)
Existing plants
purchase contracts subject to decree of 25/06/2001:
54,9 to 61 €/MWh
depending on capacity
+ premium between 0 and 15,2 €/MWh
in winter depending on the regularity of production
(for 20 years)
Onshore
New installations
purchase contracts subject to decree of
17/11/2008
- for the first 10 years:
82 €/MWh
(in the mainland)
- for the next 5 years
=2400 hours/year: 82 €/MWh
2800 hours/year: 68 €/MWh
=3600 hours/year: 28 €/MWh
(with linear interpolation in the
mainland; annual degression 2%)
- overseas:
110 €/MWh
for 15 years independent from
productivity*
Existing installations
subject to the decree of 8/06/2001- for the first 5 years:
83.8 €/MWh
- for the next 10 years:
30.5 to 83.8 €/MWh
depending on the wind/location
Offshore
New installations
purchase contracts subject to decree
of 17/11/2008
- for the first 10 years:
130 €/MWh
- for the next 10 years
=2800 hours/year: 130 €/MWh
3200 hours/year: 90 €/MWh
=3900 hours/year: 30 €/MWh
(with linear interpolation; annual
degression 3%)
Support Scheme Feed-in tariffs    
Current Applicable LAw Art. 10 of Act No. 2000-108 of 10/02/2000 on the
Modernisation and Development of the Public
Electricity Service (latest amended 1/01/2008)
Decree of 1/03/2007
Decree of 25/03/2007
Art. 10 and 10-1 of Law No. 2000-108;
Decree of 10 July 2006 and Decree of 8 June 2001
Particularities   *) Productivity is defined as producing time in relation to the amount of
generated electricity at peak output.
Price Biomass/Biogas

  Biogas
New installations
purchase contracts subject to the Decree of 10/07/2006
= 150 kW -> 90 €/MWh in the mainland
->103 €/MWh overseas
= 2 MW -> 75 €/MWh in the mainland
-> 86 €/MWh overseas
(linear interpolation)
for 15 years
Energy efficiency based premium
0 (energy yield < 40 %) to 30 €/MWh (> 75 %)
(linear interpolation)
Methanisation premium for all biogas installations excepted for those based upon
non hazardous waste storage facilities:
20 €/MWh
(no annual degression)
Existing plants
purchase contracts subject to the Decree of 3/10/2001
45 to 57.2 €/MWh depending on capacity
Energy efficiency premium
0 to 3 €/MWh for 15 years
Vegetable biomass material
49 €/MWh in the mainland
55 €/MWh overseas
for 15 years
Energy efficiency premium
0 (energy yield = 40 %) to 12 €/MWh (= 70 %)
(linear interpolation, i.e. 5€/MWh at 50 % and
10 €/MWh at 60 %)
Animal residues (natural and transformed)
and
Household waste
45 to 50 €/MWh for 15 years
Energy efficiency premium
0 to 3 €/MWh
Current
applicable law
Art. 10 of Act No. 2000-108 of 10/02/2000 on the Modernisation and Development
of the Public Electricity Service (latest amended 1/01/2008)
Decree of 10/07/2006
Decree of 3/10/2001
Art. 10 of Act No. 2000-108 of 10/02/2000 on the
Modernisation and Development of the Public
Electricity Service (latest amended 1/01/2008)
Decree of 16/04/2002
Decree of 13/03/2002
Decree of 2/10/2001

 

 

  Photovoltaic Geothermal
Price New installations
purchase contracts subject to the decree of 10/07/2006
300 €/MWh in the mainland
400 €/MWh overseas and in Corsica
for 20 years
Installation costs integration premium
250 €/MWh in the mainland
150 €/MWh overseas and in Corsica
(no annual degression)
Existing installations
subject to the Decree of 13/03/2002
152.5 €/MWh in the mainland
305 €/MWh overseas and Corsica
for 20 years
New installations
purchase contracts subject to the decree of 10/07/2006
120 €/MWh in the mainland
100 €/MWh overseas
for 15 years
Energy efficiency premium:
0 to 3 €/MWh in the mainland
Existing installations
purchase contracts subject to the Decree of 13/03/2002
76.2 €/MWh for 15 years
Energy efficiency premium
0 to 3 €/MWh
Current
applicable law
Art. 10 of Law No. 2000-108;
Decree of 10 July 2006 and
Decree of 13 March 2002
Art. 10 of Law No. 2000-108;
Decree of 10 July 2006 and
Decree of 13 March 2002
Particularities Tariff available until cap is reached (cap: 1500 hours of peak
capacity in the mainland, 1800 hours of peak capacity in
overseas and Corsica); after cap was reached: 50 €/MWh
 
Related Posts:
  1. Feed-in Tariffs for Electricity from Renewable Energy Sources in Spain

    2009 Hydro Wind Biomass Price Tariff - up to 10 MW 80.61 €/MWh for the first 25 years 72.55 €/MWh...

  2. Feed-in Tariffs For Energy from Renewable Sources in Portugal

      Hydro Wind Biomass / Biogas Photovoltaic Others Price 85,9 €/MWh 94,5 €/MWh 105,3 €/MWh below 5 kW: 420 €/MWh...

  3. Feed-in Tariffs For Renewable Energy in Greece

      Hydro (Small Hydro Plants < 15 MW) Wind Biomass Photovoltaic Geothermic Price Mainland interconnected system (mainland): 80,14 €/MWh Islands...

  4. Feed-in Tariffs for Electricity from Renewable Energy Sources in Slovak Republic

      Hydro Wind Price up to 5 MW commissioned before 1 January 2005: 65.98 €/MWh commissioned after 1 January 2005,...