Feed-in Tariffs For Renewable Energy in France
| Hydro | Wind | ||
| Price | New installations purchase contracts subject to decree of 1/03/2007: 60,7 €/MWh + bonus between 5 and 25 €/MWh for small installations + bonus between 0 and 16,8 €/MWh in winter depending on the regularity of production (for 20 years) Existing plants purchase contracts subject to decree of 25/06/2001: 54,9 to 61 €/MWh depending on capacity + premium between 0 and 15,2 €/MWh in winter depending on the regularity of production (for 20 years) |
Onshore New installations purchase contracts subject to decree of 17/11/2008 - for the first 10 years: 82 €/MWh (in the mainland) - for the next 5 years =2400 hours/year: 82 €/MWh 2800 hours/year: 68 €/MWh =3600 hours/year: 28 €/MWh (with linear interpolation in the mainland; annual degression 2%) - overseas: 110 €/MWh for 15 years independent from productivity* Existing installations subject to the decree of 8/06/2001- for the first 5 years: 83.8 €/MWh - for the next 10 years: 30.5 to 83.8 €/MWh depending on the wind/location |
Offshore New installations purchase contracts subject to decree of 17/11/2008 - for the first 10 years: 130 €/MWh - for the next 10 years =2800 hours/year: 130 €/MWh 3200 hours/year: 90 €/MWh =3900 hours/year: 30 €/MWh (with linear interpolation; annual degression 3%) |
| Support Scheme | Feed-in tariffs | ||
| Current Applicable LAw | Art. 10 of Act No. 2000-108 of 10/02/2000 on the Modernisation and Development of the Public Electricity Service (latest amended 1/01/2008) Decree of 1/03/2007 Decree of 25/03/2007 |
Art. 10 and 10-1 of Law No. 2000-108; Decree of 10 July 2006 and Decree of 8 June 2001 |
|
| Particularities | *) Productivity is defined as producing time in relation to the amount of generated electricity at peak output. |
||
| Price | Biomass/Biogas | |
| Biogas New installations purchase contracts subject to the Decree of 10/07/2006 = 150 kW -> 90 €/MWh in the mainland ->103 €/MWh overseas = 2 MW -> 75 €/MWh in the mainland -> 86 €/MWh overseas (linear interpolation) for 15 years Energy efficiency based premium 0 (energy yield < 40 %) to 30 €/MWh (> 75 %) (linear interpolation) Methanisation premium for all biogas installations excepted for those based upon non hazardous waste storage facilities: 20 €/MWh (no annual degression) Existing plants purchase contracts subject to the Decree of 3/10/2001 45 to 57.2 €/MWh depending on capacity Energy efficiency premium 0 to 3 €/MWh for 15 years |
Vegetable biomass material 49 €/MWh in the mainland 55 €/MWh overseas for 15 years Energy efficiency premium 0 (energy yield = 40 %) to 12 €/MWh (= 70 %) (linear interpolation, i.e. 5€/MWh at 50 % and 10 €/MWh at 60 %) |
|
| Animal residues (natural and transformed) and Household waste 45 to 50 €/MWh for 15 years Energy efficiency premium 0 to 3 €/MWh |
||
| Current applicable law |
Art. 10 of Act No. 2000-108 of 10/02/2000 on the Modernisation and Development of the Public Electricity Service (latest amended 1/01/2008) Decree of 10/07/2006 Decree of 3/10/2001 |
Art. 10 of Act No. 2000-108 of 10/02/2000 on the Modernisation and Development of the Public Electricity Service (latest amended 1/01/2008) Decree of 16/04/2002 Decree of 13/03/2002 Decree of 2/10/2001 |
| Photovoltaic | Geothermal | |
| Price | New installations purchase contracts subject to the decree of 10/07/2006 300 €/MWh in the mainland 400 €/MWh overseas and in Corsica for 20 years Installation costs integration premium 250 €/MWh in the mainland 150 €/MWh overseas and in Corsica (no annual degression) Existing installations subject to the Decree of 13/03/2002 152.5 €/MWh in the mainland 305 €/MWh overseas and Corsica for 20 years |
New installations purchase contracts subject to the decree of 10/07/2006 120 €/MWh in the mainland 100 €/MWh overseas for 15 years Energy efficiency premium: 0 to 3 €/MWh in the mainland Existing installations purchase contracts subject to the Decree of 13/03/2002 76.2 €/MWh for 15 years Energy efficiency premium 0 to 3 €/MWh |
| Current applicable law |
Art. 10 of Law No. 2000-108; Decree of 10 July 2006 and Decree of 13 March 2002 |
Art. 10 of Law No. 2000-108; Decree of 10 July 2006 and Decree of 13 March 2002 |
| Particularities | Tariff available until cap is reached (cap: 1500 hours of peak capacity in the mainland, 1800 hours of peak capacity in overseas and Corsica); after cap was reached: 50 €/MWh |
- Feed-in Tariffs for Electricity from Renewable Energy Sources in Spain
2009 Hydro Wind Biomass Price Tariff - up to 10 MW 80.61 €/MWh for the first 25 years 72.55 €/MWh...
- Feed-in Tariffs For Energy from Renewable Sources in Portugal
Hydro Wind Biomass / Biogas Photovoltaic Others Price 85,9 €/MWh 94,5 €/MWh 105,3 €/MWh below 5 kW: 420 €/MWh...
- Feed-in Tariffs For Renewable Energy in Greece
Hydro (Small Hydro Plants < 15 MW) Wind Biomass Photovoltaic Geothermic Price Mainland interconnected system (mainland): 80,14 €/MWh Islands...
- Feed-in Tariffs for Electricity from Renewable Energy Sources in Slovak Republic
Hydro Wind Price up to 5 MW commissioned before 1 January 2005: 65.98 €/MWh commissioned after 1 January 2005,...