Vestas Launches Next Generation Offshore Wind Turbine

Vestas launches next generation offshore turbine

Today, at a press conference in London at 12.30 local time Vestas reveals the details of its next generation offshore turbine. Instead of the previously communicated capacity of 6.0 MW, the turbine will have a capacity of 7.0 MW and a rotor diameter of 164 metres.

Construction of the first V164-7.0 MW prototypes is expected in Q4 2012. Serial production is set to begin in Q1 2015 provided a firm order backlog is in place to justify the substantial investment needed to develop the new production and assembly facilities required for a turbine of this size.

Further details of the new turbine will be uploaded to vestas.com immediately after the press meeting.

Related Posts:
  1. Vestas with New 3 MW Wind Turbine for the Offshore Market – Model Name V112-3.0 MW

    Vestas launches V112-3.0 MW turbine for offshore Today, at the European Offshore Wind Conference in Stockholm, Sweden, Vestas will announce...

  2. Vestas and DONG Energy to collaborate on new offshore turbine

    DONG Energy and Vestas have today announced the signing of a letter of intent regarding test of the new V164-7.0...

  3. 7 MW Wind Turbine From Vestas Just Announced

    Vestas has earlier today at a press conference in London revealed the details of its next generation dedicated offshore turbine....

  4. Vestas lands order for the largest wind power project in Australia – with the new V112 turbine now released for sale both on and offshore

      Vestas lands order for the largest wind power project in Australia – with the new V112 turbine now released...

Leave a Reply